323 Warehouse Complex (Shymkent)
Warehouse Complex in Shymkent
Currently, the first phase of the warehouse complex with a total area of 2,800 sq.m. is operational. The second phase, of the same size (2,800 sq.m.), is under construction (design documentation completed).
The facility is located...
Warehouse Complex in Shymkent
Currently, the first phase of the warehouse complex with a total area of 2,800 sq.m. is operational. The second phase, of the same size (2,800 sq.m.), is under construction (design documentation completed).
The facility is located in Enbekshi District of Shymkent and enjoys a strategically advantageous location with direct access to the international transport corridor “Tashkent – Shymkent – Almaty,” ensuring convenient logistics and high transport accessibility.
The existing land plot allows potential further development, with the possibility to construct additional warehouse and auxiliary facilities, enabling the scaling of the complex according to tenant or investor requirements.
Key Features:
-
Class: B
-
Type: Heated warehouse
-
Total Area: 5,600 sq.m.
-
Pallet Positions: 6,200
-
Office Area: 650 sq.m.
-
Working Height: 9.6 m
-
Temperature Range: +17 / +23 °C
-
Docking Gates: 4
-
Railway Siding: Within the complex
Facility Status:
-
Phase 1 – Operational
-
Phase 2 – Under Construction









